October 2025 Construction Photos

Click on the images below to view full screen.

U.S. 69 entrance and exit ramps emerge from 167th Street “dog bone” roundabouts.

Workers standing nearby show the scale of U.S. 69 directional signs.

Sign structures are delivered and prepared for erection.

Crews pour concrete for the inside shoulder of U.S. 69 near 119th Street.

Work continues on and under the new 167th Street bridge.

A new northbound U.S. 69 bridge takes shape over I‑435.

Grading work takes place next to U.S. 69 near 167th Street.

A construction worker paints cross members on the new 167th Street bridge and seals any scratches that may have occurred during installation.

Large loop ramp staging areas at the 135th Street/U.S. 69 interchange support ongoing construction.

Crews pour concrete for the inside shoulder of U.S. 69 near 119th Street.

Construction workers at 167th Street and U.S. 69 place rip-rap stone to protect adjacent slopes from erosion.